This document defines the order in which ordinary ingress passes through two independent capacity authorities — Core's Core byte HWM budget and Framework's Application job queue — and when and how Framework observes and propagates the resulting pressure state. It states the responsibility boundary among Application, Core, Framework host, and provider as a contract that callers depend on, together with the common implementation structure that every language runtime must satisfy.

1. Two Independent Capacity Authorities

Core and Framework observe different overloads.

  • Core knows the frame bytes currently held by transport queues and limits queue-memory bursts caused by connection count and payload size.
  • Framework knows how many application jobs are waiting before handler start and limits ingress that exceeds application processing capacity.

  • Core byte HWM and the Application job queue do not share settings, profiles, units, accounting boundaries, or observations. Copying one authority's values into the other authority's counter creates overlapping responsibility — Core must not infer handler processing capacity, and Framework must not calculate socket-queue bytes.

  • Core byte HWM is the transport path's last safety boundary, and the Application job queue is the safety boundary for handler ingress speed — both are required, but they are not the same protection. Even when Framework pressure reduces remote traffic early, data can already be present in the remote Core queue, OS buffers, the network, and the local Core queue. Conversely, a Core queue can be empty while a handler job waits for a long time.
Authority What it limits Accounting or acquisition Release
Core byte HWM Physical-frame charge currently owned by a Core application-direction queue When the Core queue owns a frame When the Core queue gives up frame ownership, including receive dequeue
Application job queue Application job permits accepted by a host before callback start Reserve immediately before receiving or claiming ordinary ingress, then transfer to a handler turn Immediately before the callback's actual first instruction, or at a pre-callback terminal
  • Core byte HWM charge includes the payload and metadata bytes defined by the contract, and once the Core queue hands a record to the binding, that record's charge ends. Framework does not request a retained-credit lease or extend Core byte charge through handler or reply lifetime.
  • Post-receive payload storage follows the ordinary message-ownership rules in Payload Ownership And Codec. Copying, moving, and releasing that storage is payload lifetime management; it is not Core byte HWM credit, a second Application job queue permit, or a separate byte-pressure authority.

Framework pressure count (permits in use) is the following value:

application job permits in use
  = reserved supply permits
  + queued application jobs

A capacity waiter has not received a permit and is not included. Converting a reservation to a queued job does not change the total; only returning the permit decreases it. A record that creates 1:N callbacks uses one permit for each actual callback turn.

2. Configuration and Profile Boundary

Core and Framework profiles may use the same labels, but they are different public types with different calculations.

Setting group Owner Default profile Manual override
CoreHwmMemoryLimitBytes, CoreHwmBudgetBytes, CoreHwmProfile Core Balanced Core memory or budget bytes
ApplicationJobQueueProfile, MaxQueuedApplicationJobs Framework host Balanced A precise host job-permit limit
  • Framework only passes Core configuration values to binding context options at startup; it does not calculate profile ratios or divide a budget by connection count. Projecting a Core snapshot into Framework status is also read-only observation and is not an input to Framework pressure calculation.
  • The only feedback that Framework job pressure gives Core is one absolute RUNNING/PAUSED receive-flow state applied to supported sockets. Framework does not change Core HWM settings or queued-byte counters to match this state transition.

3. Ordinary Ingress Permit Order

Ordinary ingress — every path that receives or claims a record from Core or the binding that has not yet received a permit — follows the same rule regardless of the context in which it arrives. STREAM application packets, cross-node Session application records (see STREAM Server Session, Session And Actor Binding), handshake/bind/unbind, and every other ordinary application job ingress follow this order without exception.

Ordinary ingress follows this order.

  1. Wait for a host-shared permit in oldest-live-source order.
  2. Receive or claim a record from Core or the binding only after acquiring the permit.
  3. Transfer an application record's permit to its handler turn in an owner mailbox or serial queue.
  4. Return the permit after finite internal handling of a control or malformed ordinary record.
  5. Return the permit at the common invocation boundary immediately before the callback's actual first instruction.
%%{init: {'sequence': {'actorFontSize': '18px', 'messageFontSize': '18px', 'noteFontSize': '18px', 'boxMargin': 8, 'width': 140}, 'themeVariables': {'fontSize': '18px'}}}%%
sequenceDiagram
    participant S as Socket / connection
    participant P as Host-shared permit
    participant Q as Owner queue
    participant H as Handler callback

    S->>P: Request permit in oldest-waiting-source order
    alt permit acquired
        P-->>S: permit granted
        S->>S: receive/claim record
        alt identified pre-receive as terminal reply/error completion
            S->>H: bypass permit, process immediately, release right after internal handling
        else application record
            S->>Q: transfer permit to owner queue's handler turn
            Q->>H: assign handler turn
            H-->>P: release permit immediately before actual first instruction
        else control/malformed record
            S-->>P: release permit after finite internal handling
        end
    else cancel/close/shutdown while waiting
        P-->>S: cancellable wait ends (not a reject/drop)
    end

An await, coroutine suspension, continuation, or reply wait after handler start does not acquire the same permit again. A non-runnable durable backlog such as relocation returns its initial reservation after a finite handoff to the payload owner defined by that relocation specification; each runnable callback turn later acquires a new permit.

Only supply that is identified before receive as a terminal reply or error completion bypasses this permit. A record first received from an ordinary connection cannot be classified later and retroactively gain this bypass. This separation lets terminal completions of operations already in progress continue while the ordinary queue is saturated.

A reply to a ClientServer Client DEALER traverses Core's single Application connection FIFO and byte HWM/PAUSED before it reaches the Framework permit boundary. It bypasses the permit after Core identifies it as a completion, but that bypass neither skips earlier DATA nor guarantees Core transport progress. A RouteMesh ROUTER-ROUTER reply reaches this permit boundary through the separate Completion connection.

Each source has one outstanding permit waiter, handed off in oldest-waiter order. A source that processed a batch moves to the tail of the queue.

Neither a batch nor a 1:N callback publishes more application jobs than the permits it secured.

Framework heartbeat, topology, relocation, and service-wire SendReady kind 12 do not constitute this completion supply. Those control records remain on the application data line under its existing FIFO and liveness contract; they are not moved to the Core completion connection or to a separate Framework control queue.

The following are not allowed:

  • Receiving first without a permit and only afterward incrementing a separate counter
  • Reimplementing Core HWM with a retained-credit lease or a Framework byte HWM
  • Replacing saturation with rejection, dropping, fixed-delay polling, or busy spinning
  • Storing a record in an unbounded or hidden side backlog not owned by a specification

The Set of Ready Owners (Implementation)

For a record that has acquired a permit to enter an owner queue, the execution resource must know that this owner currently has work to do.

  • Maintain as state the set of owners that currently have work to do. This state represents "this is the current state," not a one-time "something changed" notification, and the same owner never enters it twice. Because an owner with remaining work must eventually be processed even if a notification is lost, a woken execution resource always rechecks this state.

Internal confirmation condition — that a woken execution resource always rechecks the set of ready owners, so that no wakeup is missed even when a notification is lost, is a white-box invariant of this state management.

Do Not Separate the Admission Decision from Enqueueing (Implementation)

Deciding which owner's queue to put a message into requires checking several conditions — whether that owner is still on this node, whether there is a slot, and whether it is sealed for a move.

  • These checks and the actual enqueue occur within the same span. If the owner changes between the check and the enqueue, the message ends up in the queue of a node that is no longer the owner, and no one processes that queue — the sender waits until timeout.

Handle the following as one commit inside that span.

  1. Check host/unit admission as specified in Host relocation §14–§15.
  2. Is the target object on this node and is the owner information valid
  3. Is it not sealed for a move, not waiting for creation, and not waiting for a session connection
  4. Can both the lane's item count and bytes be reserved together
  5. Commit the accepted-order sequence and append the message to the owner queue
  6. If the queue was empty, put that owner into the set of ready owners and notify the execution resource immediately

  7. A message that fails a check does not appear in the queue. It is not implemented as enqueue-then-remove — enqueuing and then removing lets it possibly execute in between, and the removal cannot be distinguished in observations either. A call waiting for a response receives the failure reason as its result. A failed reservation or enqueue also leaves the item/byte usage and accepted sequence unchanged. A failed attempt does not change the ordering or admission result of the next valid work item.

Per-language discretion. Implementations are free to use a lock or another method for this span. The criterion is that only the check and the enqueue are inside this span, and that work that would lengthen the span — such as deserialization or handler lookup — happens outside it. As long as that condition holds, the observable result — that the span stays short and the owner does not change between the check and the enqueue — is the same no matter which implementation method is used.

Internal confirmation condition — that a message whose owner changed between the check and the enqueue does not go into the old owner's queue is a white-box invariant confirmed only by the fact that the above commit procedure is a single atomic span.

Permit Return and No Resource Holding While Waiting (Implementation)

An application permit is released at the actual first instruction of its own target's callback; a control or malformed record's permit is released immediately after internal handling. This release point is the same point at which a STREAM session — the server-side execution unit kept alive from accepting one STREAM connection until it closes — callback starts — no separate rule exists per context. Cancellation, source close, and shutdown clean up waiters and handed-off permits exactly once.

  • Same-host relay, fanout, serial-owner, and relocation paths must not wait for a new permit from the same authority while holding a gate, execution authority, or resource needed to return a permit. A sustained wait/capacity cycle is not grounds for a bypass — it is a protocol or runtime bug.

4. Reading Multiple Items from the Socket (Implementation)

Separately from batch-processing after taking ownership, the same problem exists at the step of pulling from the socket. If only one item is read from the socket per wake-up before returning, waking and reading repeat as many times as messages piled up, and cost grows as load rises.

  • On each wake-up, read multiple items in a row within a bound. Reading indefinitely while the peer keeps sending would let one connection monopolize the receive stage, delaying other connections and binding-operation completion processing.
  • The bound sets count, bytes, and elapsed time together, and applies whichever is hit first. Count alone makes large messages take too long, and time alone reads the clock too often for small messages.
  • The next rotation starts right after the connection where the current rotation stopped (keeping a cursor). Always iterating from the start means earlier connections keep being processed first, and later connections get delayed even with a bound in place.

This rule applies to every multi-connection receive path, including fanout, RouteMesh, ClientServer, service connections, and STREAM. If there is leftover work when the bound is hit, it continues reading on the next wake-up.

The count bound is fixed at 64 items per rotation. The byte bound and the elapsed- time bound are per-language discretion — even with different values, the observable result is the same: the rotation start point always resumes right after the connection where the previous rotation stopped, and no connection monopolizes the receive stage indefinitely, so other connections get a chance to progress. The check is whether one connection with a slow consumer still leaves other connections' progress unblocked.

Wiring the directional socket options of RouteMesh's MeshNode — the runtime node that participates in a RouteMesh to send or receive messages — SendHighWaterMark, ReceiveHighWaterMark, SendTimeout, ReceiveTimeout — is not covered by this document. The channel-transport topic owns the public configuration defined by RouteMesh Topology and MeshNode Startup.

5. Separating Receipt Handling from State Change (Implementation)

  • The receive callback moves ownership of the received data to a runtime-side value and returns immediately. The receive context is usually owned by the transport layer, so lingering here delays other receives on that connection.
  • Format validation finishes before calling the handler. Malformed input does not reach the handler — a call waiting for a response ends in ProtocolError, and a call not waiting leaves only a record.

Internal confirmation condition — that the receive callback does not call the handler or change the state of a Spot — a logical instance with an address and state that can receive messages — is a white-box invariant so that the receive path does not create a path that changes state without going through the handler execution gate.

6. Pressure State and Socket Control

For effective maximum M and configured pause and resume percentages P and R, startup computes:

pause permit count  = ceil(M * P / 100)
resume permit count = floor(M * R / 100)

P is in 1..100 and defaults to 80; R is in 0..99, defaults to 60, and must satisfy R < P. In running, the state transitions to paused when permits in use reach the pause count, and in paused, it transitions to running when they fall to the resume count. Between the two thresholds, the current state is retained.

  • Framework applies the transitioned absolute state only to RouteMesh ROUTER-ROUTER two-lane sockets and ClientServer DEALER-ROUTER single-lane sockets. PUB/SUB, Classic fanout, and STREAM are outside this integration and retain their existing Core byte HWM and structural queue limits.
  • PAUSED does not change a Core HWM value. Core independently composes a remote-pause blocker and a local byte-HWM blocker. RUNNING removes only the remote-pause reason, so a send remains waiting while local HWM is still full. Pressure state itself does not change route readiness or transport liveness.
  • The host queue owner computes pressure state at a synchronization boundary such as a permit-count change.
  • When the state changes, it applies the new absolute state to a snapshot of supported sockets.
  • It does not repeat an already-applied identical state, and a stale transition cannot overwrite the latest state.
  • Shutdown does not wait indefinitely for a final state application, and resetting observation counters preserves the current state and pause duration.
  • This receive-flow state API is the only runtime control point between Framework pressure and Core send flow. Framework does not create raw flow frames or use the Core control lane as a general Framework channel.

Internal confirmation condition — the order in which a new socket applies the current host pressure state before publication in the receive-target registry, and close removes the socket from the registry first before proceeding, is a white-box invariant of the registry implementation. Binding calls run outside queue, registry, and user-callback locks. Configuration failures other than lifecycle results racing with close are recorded in diagnostics and metrics.

7. Composition with Send Completion

  • Core and the binding own HWM waiting, internal retries, and per-operation completion. Framework selects a specific target and starts one binding operation. After the operation starts, Framework does not select another target or create a second operation for the same payload because of PAUSE or HWM.
  • Framework does not retain the removed send_ready callback or event, a readiness waiter, or a retry adapter. Deadline — the final time point by which work must finish — cancellation, detach, and shutdown follow the existing first-terminal rule of the operation state machine. Framework service-wire SendReady kind 12 is a Framework service-control record and is a different contract from the removed binding callback.

8. The Three Backpressure Stages and Kinds of Limits

  • The three Backpressure stages apply only to send, publish, and one-way calls. A Request does not wait to secure a bounded queue because its caller can judge the returned result. Local/remote error selection follows Framework error model §5.

  • If the first submission is rejected, wait for send space to open up until a fixed time.

  • If space opens within the time, submit once.
  • If the time runs out first, end with DeadlineExceeded.

  • These three stages apply only to the span before the public result is finalized. A failure that happens after an already completed call is not covered here — a skipped local target after publish has started, a dropped one-way during a move, or a target admission failure of a completed send — none has a result to return to the caller, so it is recorded only as an observation.

  • While waiting, that work does not hold execution authority. Holding it while waiting blocks another request to the same Spot for as long as it waits for send space.
  • The waiting slot itself also has a bound. If the waiting slots are full, it ends immediately with DeadlineExceeded without waiting. Being backpressured itself is not a value the caller receives — Backpressured is not a public terminal result. Without a bound, this side's memory would keep growing indefinitely, following the peer's processing speed, when the peer is slow.

StreamNode's client-to-server complete-message MaxMessageSize is an independent wire guard from this capacity. It checks header plus payload excluding the 6-byte prefix, defaults to 64 KiB, and does not apply to server-to-client outbound.

Terminal meaning is distinguished by kind of limit and is not silently dropped.

Limit What it measures Meaning of saturation
Core HWM Directional queued/accounted bytes Backpressure from Core queue to sender
Application job queue Host-instance reserved/queued/in-use permits Cancellable shared-cap wait
FIFO per execution object — execution contract §7 Per-execution-object count and bytes Structural-limit error from error model §5
Outbound admission waiter Bounded waiter per operation family Original send deadline/cancellation result

No path creates a separate unbounded backlog, polling, busy-spin, or silent replay.

Transferring the Owner Reservation — Joining Two Stages Without a Gap

The owner FIFO's count and byte reservation is not carried by a single component. The receive mailbox carries it from receive acceptance until the record is claimed into the owner's execution queue, and the execution queue carries it from that claim until handler terminal completion (02 §7 owns the release timing on the execution-queue side).

  • One record's reservation is unbroken from receive acceptance to handler terminal completion. At the claim boundary, the mailbox return and the execution-queue charge happen together. If there is an uncounted stretch in between, in-flight payload that has been dequeued but whose handler has not finished is caught by no limit at all — and the more handlers hold large payloads for long, the more memory grows without bound during that gap.
  • The transfer at claim is not a re-decision. If the execution queue rejects an already-accepted record on capacity grounds, that is the "turning saturation into a reject" that §3 forbids. The execution queue only accounts the transferred reservation; capacity rejection applies only to new local submissions inside the same runtime.
  • The two stages never count the same record at the same time. Double counting saturates the owner limit ahead of the real backlog, and the limit's value loses its meaning.

Internal confirmation condition — on the claim path there is no moment at which the record's bytes are counted by neither side between the mailbox return and the execution-queue charge, and no site where a record transferred with its permit receives a capacity rejection from the execution queue.

9. Large Payloads and Operational Values

  • The Application job queue limits job count; it does not weight jobs by payload bytes. An empty payload and a large payload each consume one job. The Framework queue limit is therefore not a process-memory byte hard cap.
  • For workloads that retain large payloads for a long time, measure production- equivalent payload distribution, permits in use, process memory, throughput, and latency together, then lower MaxQueuedApplicationJobs. Limit an individual message size separately with MaxMessageSize. Do not connect the Core profile to the Framework profile or restore retained-credit leases to solve this problem.
  • Core HWM remains the final safety boundary for Core queue memory. When Framework stops ordinary receive because of a permit, bytes accumulate in the local Core receive queue, and finite Core HWM plus TCP backpressure limits the sender's progress.

10. Verification Requirements

The public surface alone — send/publish/request result values, Application job queue pressure-state queries, the socket receive-flow absolute state, and Runtime metric names — confirms the following. Each item leads to one contract test.

Configuration of the two capacity authorities

  • The Core profile and the Application job queue profile can be configured differently, and each defaults to Balanced.
  • The reservation, queued-job, and callback-first-instruction permit counts follow the same rule.

Permit acquisition and order

  • Without a permit, the next ordinary record is not received first.
  • A send/request that failed a check does not change the owner queue's observed count/byte/sequence values.
  • When all shared permits are reserved, ordinary ingress waits cancellably, and terminal reply/error completion continues to progress.
  • Once a ClientServer reply reaches the Core physical head and Core identifies it as a completion, it acquires no permit. Earlier one-way DATA isn't dequeued from Core before an ordinary permit is acquired, so the permit bypass doesn't skip the Core single FIFO or HWM.
  • While one connection keeps sending, another connection's receiving still progresses.
  • The receive bound cuts off at whichever of count/bytes/elapsed time is hit first, and the next receive rotation starts right after the connection this one stopped at.
  • When one socket represents multiple peers, accounting is done per peer.
  • Malformed input does not reach the handler — a call waiting for a response ends in ProtocolError, and a call not waiting leaves only a record.

Pressure state and sockets

  • The 80% pause, 60% resume, and hysteresis between the thresholds are precise.
  • New-socket synchronization, close races, and stale transitions do not break the latest absolute state.
  • Receive-flow state is applied only to RouteMesh ROUTER-ROUTER and ClientServer DEALER-ROUTER sockets.

Backpressure and Core HWM

  • Work waiting for send space does not hold execution authority.
  • When the send-wait slot is full, it ends immediately with DeadlineExceeded without waiting.
  • Owner structural rejection and shared-cap wait are observed as distinct errors/metrics.
  • A failure after an already completed call (a skip after publish has started, a target failure of a completed send) does not change the caller's result and is recorded only as an observation.
  • When the Core receive byte HWM fills, backpressure is carried to the sender and a record is not dropped.
  • RouteMesh ROUTER-ROUTER Completion supply progresses independently of ordinary permit saturation.
  • A ClientServer DEALER-ROUTER reply can be delayed behind earlier DATA, HWM, and PAUSED in the Core single FIFO. If the configured request timeout ends first, the late reply doesn't create a second terminal.
  • Framework does not use retained receive, a send_ready waiter, or a separate send retry.

The specific configuration values are defined by Framework API; status and metric names by Runtime Status and Runtime Metric.